WA Home

WA Home
Please click on the picture to go to the MYP Technology Website
Showing posts with label details. Show all posts
Showing posts with label details. Show all posts

Tuesday, March 20, 2012

G10 2nd Semester Tech Clas #25

Welcome back! Hope you had a great Spring Break!

Happy first day of Spring!  Look at Google today!



Continuing from last class: G10 2nd Semester Tech Class #24


In Plan stage you will be defining what will be done, when and with what resources. 
Focus on the process of creation of the final product your choose in Design stage.

Remember to include:
  • step by step list of instructions to put together your description of your tour stop- mobile version. (like giving very detailed instructions for someone else to create it for you!) 
  • a detailed timeline (for the process of building/creation)
  • the resources you will use
  • Look at Due Dates for Project 2 and plan accordingly.
  • For more info on Plan stage and tools to complete it, please revisit: G10 2nd Semester Tech Class #10
Don't forget to check the G10 Due Dates to stay on task. Plan stage is due today and record your progress in your Process Journal. Thanks!

Monday, January 30, 2012

G10 2nd Semester Tech Class #10

Today we will start working on Plan!

The main idea in the Plan stage is that you can organize yourselves on what will be done, when and with what resources? The Plan stage needs to:

    1. make a detailed step by step list of tasks/instructions on how the chosen Design will be created/built (think as if someone else will built/create your product based on these instructions)
    2. show a timeline of tasks and resources that will guide you through the next stage: Create. Use the Gantt and CPM (Critical Path Method usually used together with PERT) concepts we talked about in class: simultaneously, overlapping and sequence.
    3. Include evidence of planning for materials and resources usage
    4. Make any modifications you considered needed to your chosen design
    A couple suggested tools for Plan stage can be the following:
    WA Expansion reports examples:



    Remember that you can always use the Design Folder Checklist to make sure your stage is complete.
      Don't forget to check the G10 Due Dates to stay on task. Plan is due today and record your progress in your Process Journal. Thanks!