WA Home

WA Home
Please click on the picture to go to the MYP Technology Website

Monday, January 30, 2012

G10 2nd Semester Tech Class #10

Today we will start working on Plan!

The main idea in the Plan stage is that you can organize yourselves on what will be done, when and with what resources? The Plan stage needs to:

    1. make a detailed step by step list of tasks/instructions on how the chosen Design will be created/built (think as if someone else will built/create your product based on these instructions)
    2. show a timeline of tasks and resources that will guide you through the next stage: Create. Use the Gantt and CPM (Critical Path Method usually used together with PERT) concepts we talked about in class: simultaneously, overlapping and sequence.
    3. Include evidence of planning for materials and resources usage
    4. Make any modifications you considered needed to your chosen design
    A couple suggested tools for Plan stage can be the following:
    WA Expansion reports examples:



    Remember that you can always use the Design Folder Checklist to make sure your stage is complete.
      Don't forget to check the G10 Due Dates to stay on task. Plan is due today and record your progress in your Process Journal. Thanks!

      No comments:

      Post a Comment